XYZ analysis classifies SKUs by how predictable their demand is, using the coefficient of variation: X is steady, Y is variable and Z is erratic.

Where ABC measures value, XYZ measures volatility. A common split uses the coefficient of variation (CV) of demand: X for CV up to 0.5, Y for 0.5 to 1.0 and Z above 1.0. Thresholds vary between businesses and depend on the time bucket used.

How to calculate XYZ analysis

CV = Standard Deviation of Demand ÷ Mean Demand
X: CV ≤ 0.5   Y: 0.5 < CV ≤ 1.0   Z: CV > 1.0

XYZ analysis example

Illustrative numbers: a cleaning product selling 50, 55, 48 and 52 a week has a CV well under 0.5 (X). A spare part selling 0, 0, 30 and 2 a week has a CV above 1 (Z). The first suits automatic replenishment; the second needs an intermittent-demand method or a minimum-stock policy.

Why XYZ analysis matters for distributors

Combining XYZ with ABC tells you where automation is safe (AX, BX) and where a planner should stay involved (AZ). It also explains why one forecasting method rarely fits a whole range.

Common XYZ analysis mistakes

  • Calculating CV on daily data for slow items, which makes almost everything look erratic.
  • Treating Z items as forecastable with standard smoothing methods.

XYZ analysis in Supply Chain Manager

Supply Chain Manager uses the same X, Y and Z bands (CV ≤ 0.5, ≤ 1.0, above 1.0) on its Forecast Accuracy matrix, alongside ABC classes.

Open the live demo

Examples on this page use made-up round numbers to show the calculation. They are not benchmarks or results from real businesses.